ONSLOW COUNTY SCHOOLS
JACKSONVILLE, NORTH CAROLINA
I
NTEGRATED PLANNING FOR SCHOOL AND COMMUNITY
(IPSAC)
L
AND USE STUDY REPORT
PREPARED AND SUBMITTED BY
O
PERATIONS RESEARCH AND EDUCATION LABORATORY
I
NSTITUTE FOR TRANSPORTATION RESEARCH AND EDUCATION
NORTH CAROLINA STATE UNIVERSITY
SEPTEMBER 18, 2015
Table of Contents
OVERVIEW ................................................................................................................................................................ 1
INTRODUCTION ....................................................................................................................................................... 2
KEY TREND AND STATUS INDICATORS ........................................................................................................... 2
GROWTH .................................................................................................................................................................... 4
FACTORS DRIVING GROWTH ..................................................................................................................................... 6
G
ROWTH BY AREA .................................................................................................................................................... 6
F
UTURE GROWTH ...................................................................................................................................................... 7
U.S. MARINE CORPS ................................................................................................................................................ 8
B
ASE PERSONNEL LEVELS ......................................................................................................................................... 8
M
ARINE CORPS HOUSING .......................................................................................................................................... 8
B
ASE SCHOOLS .......................................................................................................................................................... 9
O
FF-BASE RESIDENTIAL PREFERENCES ..................................................................................................................... 9
WATER/SEWER......................................................................................................................................................... 9
ONWASA ................................................................................................................................................................. 9
Water .................................................................................................................................................................. 10
Sewer.................................................................................................................................................................. 10
J
ACKSONVILLE ........................................................................................................................................................ 11
R
ICHLANDS ............................................................................................................................................................. 11
S
WANSBORO ............................................................................................................................................................ 11
C
AMP LEJEUNE ........................................................................................................................................................ 12
TRANSPORTATION ............................................................................................................................................... 12
NON-RESIDENTIAL DEVELOPMENT ............................................................................................................... 13
C
OMMERCIAL DEVELOPMENT ................................................................................................................................. 13
Richlands Commercial Development ................................................................................................................. 13
Swansboro Commercial Development ............................................................................................................... 14
I
NDUSTRIAL DEVELOPMENT .................................................................................................................................... 14
R
EDEVELOPMENT .................................................................................................................................................... 14
L
ARGEST EMPLOYERS ............................................................................................................................................. 15
F
UTURE NON-RESIDENTIAL DEVELOPMENT ............................................................................................................ 15
RESIDENTIAL DEVELOPMENT.......................................................................................................................... 15
J
ACKSONVILLE RESIDENTIAL DEVELOPMENT .......................................................................................................... 16
R
ICHLANDS RESIDENTIAL DEVELOPMENT ............................................................................................................... 17
S
WANSBORO RESIDENTIAL DEVELOPMENT ............................................................................................................. 17
R
ESIDENTIAL SUBDIVISIONS .................................................................................................................................... 17
M
ULTI-FAMILY HOUSING ........................................................................................................................................ 25
M
OBILE HOMES ....................................................................................................................................................... 25
F
UTURE RESIDENTIAL DEVELOPMENT ..................................................................................................................... 25
LIST OF INTERVIEWS AND DATA SOURCES ................................................................................................. 26
I
NTERVIEWS: ........................................................................................................................................................... 26
D
ATA SOURCES: ...................................................................................................................................................... 26
1
OVERVIEW
School systems nationwide are facing difficult planning challenges arising from an increasing
student population, an aging school infrastructure, and increasing complexity in student
assignment. These challenges are shared by the communities that must fund building and
renovation projects. The Operations Research and Education Laboratory (OREd) at NCSU’s
Institute for Transportation Research and Education (ITRE) has developed a system of Integrated
Planning for School and Community (IPSAC) which integrates community and regional data, ten-
year and demographic forecasts, land use studies, digitized pupil and school location files, and
mathematical optimization algorithms.
The integrated planning system is comprised of multiple data-driven processes including:
School Membership Forecasting
Land Use Studies
Out-Of-Capacity Analysis
Optimal School Location Scenarios
Attendance Boundary Optimization and Redistricting
The objective of the Land Use Studies component is to quantify future growth by school attendance
areas. Land Use Studies includes two components: community interviews and Geographic
Information Systems (GIS) analysis.
Community Interviews: The community interviews allow OREd to compose an impression of
future growth of the study area by interviewing planners, town managers, mayors, utility works,
chambers of commerce, economic development officials, etc. By involving the community in the
study, these interviews cultivate an understanding of infrastructure development plans
(transportation, water, sewer), recent subdivision plans, residential zonings, available land for
development, and comprehensive plans developed by the local government agencies. This report
summarizes the findings from the community interview component of the Land Use Studies.
GIS Analysis: In addition to the community interviews, OREd also performs spatial analysis
based on GIS parcel data and district students data using state-of-the-art ArcGIS software. GIS
analysis provides quantitative data concerning historic and anticipated residential growth activity
which in turn informs the membership forecast.
Through the combination of the community interviews and the data-intensive GIS analysis, OREd
is able to articulate school population growth by school attendance. The culmination of this
analysis is the Out-of-Capacity worksheet, which projects school membership by school for a ten-
year period.
2
Introduction
Onslow County lies in southeastern North Carolina and is the home of Marine Corps Base Camp
Lejeune and Marine Corps Air Station New River. Changes in the number of Marines based at
these two facilities, and relocation of retired Marines are primary factors that have influenced
population growth in the county. Onslow County is also an attractive retirement location. The
pervasive attitude toward growth among those interviewed is characterized as being pro-growth
and dedicated to effectively managing that growth.
This land use study describes the relative level and location of growth that has occurred and is
anticipated to occur in Onslow County. Findings in this report were derived from a series of
interviews that were conducted with stakeholders during May 19-21, 2015. Additional
information was gathered from Onslow County Schools and Internet sources, including the North
Carolina Department of Commerce and the North Carolina Office of State Budget and
Management websites.
This report is organized with sections that include discussion of:
Key trend and status indicators—population, employment, and economic development.
Marine Corpscurrent conditions and anticipated changes regarding the number of
personnel stationed at the base, and housing and schools on the base.
Growth in Onslow County—its causes, and factors constraining growth.
Transportation—planned highway improvements, and availability of other transportation
modes.
Water/sewer—current and planned infrastructure.
Non-residential developmentcurrent and anticipated commercial, office and industrial
development, and major employers.
Residential developmentareas with current and anticipated high residential growth, and
a summary of interviewees’ information on subdivisions.
Key Trend and Status Indicators
The North Carolina Office of State Budget and Management (OSBM) characterizes growth in the
Onslow County population for the period 2010-2020 asmedium, 7.3% -14.5%”. According to
OSBM figures, the population of Onslow County increased 8.7 percent from April 2010-July 2014,
which was higher than the average statewide rate of population increase of 4.4 percent for that
period.
Between 2010 and 2014, 92.6 percent or 14,304 people, of the 15,449 persons added to the county
population resulted from the natural rate of population increase (a greater number of births than
deaths), while the remainder, equal to 7.4 percent growth or 1,145 people, is attributed to a net in-
migration to the County between 2010 and 2014. As of April 2014, Onslow County was estimated
to have the 11
th
greatest population of North Carolina counties. However, Onslow County
experienced the fifth highest percentage of population increase between 2010 and 2014.
3
The retirement population was said to be growing primarily from residents who retire and stay in
the county, as opposed to new residents who have moved to the area from other locations. There
are no retirement communities in the county.
OSBM data show the percent of the Onslow County population attributed to in-migration as
substantially lower than that of the state as a whole for the period 2010-2014. North Carolina
Department of Commerce data reveal that the unemployment rate in the county was slightly higher
than the North Carolina state average; however, the county rate has decreased from approximately
eight percent in 2012. The Onslow County per capita personal income was somewhat lower than
the North Carolina statewide average. Table 1 summarizes this information.
Table 1: Key Trend and Status Indicators
Indicator Onslow County North Carolina
Estimated Percent Population Increase 2010-2020
13.8%
10.9%
Net In-Migration Population Increase 2010-2014
0.6%
2.8%
Unemployment Rate (June 2015)
6.2%
5.8%
Median Household Income
$44,511 (2014)
$46,450 (2012)
Data sources: North Carolina OSBM, and North Carolina Department of Commerce
The Onslow County population is projected to grow at a rate slightly below that of the North
Carolina average statewide rate through 2020, as shown in Table 2.
Table 2: Projected Annual County Population Totals 2011-2016
Location Jul-14 Jul-15 Jul-16 Jul-17 Jul-18 Jul-19 Jul-20
Onslow County 193,221 194,625 195,857 197,458 199,056 200,654 202,255
% Change N.A. 0.7% 0.6% 0.8% 0.8% 0.8% 0.8%
North Carolina 9,953,687 10,054,498 10,157,505 10,261,370 10,365,209 10,469,351 10,573,611
% Change N.A. 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
Data source: North Carolina Office of State Budget and Management.
Municipalities in Onslow County include the City of Jacksonville, and the Towns of Holly Ridge,
North Topsail Beach, Richlands, Swansboro, and a portion of Surf City.
Of the 541 North Carolina municipalities, Jacksonville had the 13
th
largest municipal population
(78,190) in July 2013. Table 3 shows estimated population growth in Onslow County and its
municipalities between April 2010 and July 2013. Note that growth in the unincorporated area of
the county during this period outpaced growth within municipal limits.
Table 3: County and Municipal Population Estimates 2010-2013
Location 2010 2013 Growth % Change
Onslow County Total
177,772
193,925
16,153
9.1%
Jacksonville 70,145 78,190
8,045
11.5%
4
Location 2010 2013 Growth % Change
Swansboro 2,663 2,890
227
8.5%
Richlands
1520
1,679
159
10.5%
North Topsail Beach 743 767
24
3.2%
Holly Ridge
1268
1,443
175
13.8%
Surf City (part) 292 298
6
2.1%
Municipal Totals 76,631 85,267
8,636
11.3%
Unincorporated Area 101,141 108,658
7,517
7.4%
Data source: North Carolina OSBM.
As a result of the presence of Camp Lejeune and Air Station New River, 30.2% of Onslow County
employment was in the government sector
1
. Other sectors with a significant share of county
employment included Retail Trade (22.1%), Accommodation and Food Services (15.7%), Public
Administration (9.6%), Health Care and Social Assistance (9.0%), Administrative and Waste
Services (7.3 %), and Construction (5.2%).
The economic bases of Onslow County include diversity beyond the military, and include:
Light manufacturing and assembly, for example, Gulfstream Steel & Supply, employing
approximately 140 and located at a former food processing plant in Holly Ridge.
Mine Safety Appliances, Oshkosh Defense Corporation, and Stanadyne Corporation, all
located in a former industrial park in Jacksonville
Call/customer care centers, including those operated by Convergys, Alorica, Nexlinks,
etc. for which spouses of military personnel comprise a large percentage of the
workforce.
A boat manufacturer - Armstrong Marine - located in Hubert on the Intracoastal
Waterway that won a contract to construct three ferries for use in the Hampton Roads
area.
While there are a few businesses that have developed locally as a result of the military presence
in Onslow County, most military purchasing is not locally sourced. The military has developed
relationships with many businesses; however, few of those businesses have established a
presence in Onslow County.
Growth
The rate of development that occurred during 2005-2007 was characterized as being significantly
higher than normal and not sustainable over time. Growth in Onslow County has slowed since
2011, and is occurring at what some interviewees considered to be a more normal rate at the time
of the interviews. One interviewee characterized recent growth in the Onslow County region as
being relatively flat, and stated that there is surplus housing on the market. Examples of
subdivisions that have not seen any construction, and have been dormant since the recession are
Patriot Park and Cypress Creek.
1
2014 data from North Carolina Department of Commerce.
5
All areas of Onslow County have experienced growth. Figure 1 shows the percentage increase in
parcel splits, a measure of growth used by Onslow County GIS, for each of the Onslow County
Townships between 2009 and 2015.
Figure 1: Onslow County Growth by Township
Locations of growth in demand for utility services, as provided by water/sewer and electric
utilities, were as follows:
The Onslow Water and Sewer Authority (ONWASA) has averaged approximately 900
new accounts per year. That figure does not represent all new customers, as some
accounts are replacements when customers move.
ONWASA is adding 800-900 water usage meters per year, with 980 meters added during
2014.
Average growth in demand for electric service has increased by 3%-4% during the past
five years in several corridors served by Duke Energy, including South Marine
Boulevard, NC 24 to Richlands, and NC 111.
The Western Boulevard area saw average growth in demand for electric service of 4%
during the past five years.
The Swansboro and Hubert areas saw average growth in demand for electric service of
3%-4% during the past five years.
Other Onslow County areas served by Duke Energy saw average growth in demand for
electric service of less than 1% average growth during the past five years.
6
The majority of the growth in demand in the two counties served by the Jones-Onslow
Electric Cooperative has been in Onslow County (85%).
The Stump Sound/Holly Ridge area has been the area of greatest growth for the Jones-
Onslow Electric Cooperative, representing approximately 25% of total growth. The
utility has also seen growth in Jacksonville, particularly in the Carolina Plantation area;
Richlands, with 8-12% growth; and the Piney Green/White Oak area. Spokespersons for
the utility believe that the Towne Pointe development is likely to spur other growth in
that area.
Factors Driving Growth
Factors said to be driving growth include:
The presence of the federal payroll.
An increase in employment, particularly in retail and service sector jobs resulting from
recent commercial development.
Expanded retail opportunities in areas that have not been retail centers, such as the
northwestern area of the county, in which a new Wal-Mart has been constructed in
Richlands, and Swansboro, where another Wal-Mart has been approved for construction.
The Jacksonville area was noted as being a desirable area for military retirees. Retirees living in
Onslow County were characterized as including both those who worked in the county and chose
to stay after they retired, as well as those who had lived in the county at an earlier stage of life
and chose to come back in retirement.
Growth by Area
Jacksonville
Recent residential growth has been largely focused on the Ramsey Road/Carolina Forest area,
which has seen significant growth.
Jacksonville partnered with ONWASA to install sewer in the Piney Green Road corridor;
however there has not been a lot of recent development in that corridor, perhaps as a result of the
difficulty in driving on the road during the construction. The area is likely to see additional
growth after road construction is completed. The availability of sewer service will support
development, such as that planned for the Patriot Park tract.
Richlands
Richlands had seen strong demand as a residential location, doubling in population over the past
15-20 years. Richlands was said to have attracted many military personnel with families as a
result of being perceived as having good schools. Recently, surplus wastewater treatment
capacity has not been available, which has limited residential development. With the start of
operations or the Northwest Wastewater Treatment Plant in early May 2015, surplus capacity
became available again, and is considered likely to result in increased residential development in
the Richlands area.
Stump Sound
The Stump Sound area has experienced a high level of rezoning activity recently, most of which
have been for commercial developments. Residential development has also occurred in the
7
Sneads Ferry and Holly Ridge areas, including both single- and multi-family developments. One
interviewee believed that recent residents in the Stump Sound area are equally divided between
families with children (from MARSOC) and retirees settling in the many apartment complexes.
Sneads Ferry was characterized as starting to see competition for land among various uses.
Onslow County was nearing completion of a community land use and transportation plan for that
area.
Growth in the Stump Sound area is evidenced by the recent increase in capacity of a Duke
Energy transmission line between Jacksonville and Wilmington to handle an increase in demand
from the Sneads Ferry area. Residential development in Sneads Ferry and Holly Ridge is
considered likely to continue.
Swansboro
Swansboro has been an attractive residential location for retirees; however, an ONWASA
representative noted that there has been little change in demand from the water treatment plant
that was constructed approximately eight years ago.
The Hubert area was mentioned by several interviewees as an area that has experienced
residential growth, as evidenced by the Peyton’s Ridge subdivision and recent subdivisions
constructed in the Sand Ridge Road area.
Future Growth
A $147 million mega-hanger is being constructed at Air Station New River, and that is likely to
bring additional training to that facility, resulting in an expansion of military activities at that
base.
The Jones-Onslow Electric Cooperative has a total of approximately 73,500 meters in use, and
anticipates that number to increase to approximately 80,000 by 2020, with 85% of the meters in
Onslow County.
Areas deemed likely to experience future growth include Richlands (as a result of the recent
construction of the Northwest Wastewater Treatment Plant), Holly Ridge (due to having
wastewater treatment capacity resulting from the purchase and connection to the Summerhouse
plant), and Swansboro (considered a desirable residential location).
With the opening of the Northwest Wastewater Treatment Plant, some development plans that
had been mothballed due to a lack of available wastewater treatment capacity may be brought
back to action. For example, the owner of approximately 200 acres near Richlands High School
is considering construction of a mixed-use development off US 258 that could include 1,000
housing units, office and retail space. A developer has expressed interest in constructing 200+
residential units on a parcel in the Richlands ETJ.
There are plans to extend NC 111 east from US 258 to Gum Branch Road at the Ramsey Road
intersection. If that highway is constructed, it will spur further development, as it will serve as a
northern connector between US 258 and the developing area north of Jacksonville.
8
Long-term expansion may see sewer service extended north to Hoffman Forest Tract 10, which
would enable development of that tract. While modest growth is possible in the US 17 North
corridor, development is considered more likely to occur in the US 258 corridor, especially after
vacant sites in the Western Boulevard corridor have been developed.
Installation of the sewer, plus the widening of Piney Green Road should spur future development
in that corridor.
U.S. Marine Corps
Base Personnel Levels
The Camp Lejeune population was increasing and new facilities were being constructed as
recently as 2011. The base population peaked at 48,000-49,000 troops in 2012. As of May
2015, here were 42,000-44,000 troops stationed at Camp Lejeune. No additional reduction in
troops is anticipated.
The MARSOC facility is still ramping up, with an additional 500+ Marines expected. The
facility is anticipated to eventually have 2,500 personnel, and remain at that level. Up to 40% of
MARSOC personnel may be deployed at any given time; however, their dependents remain in
the Jacksonville area when Marines are deployed.
A squadron will be moved from Air Station Cherry Point to Air Station New River.
Approximately 300 of the 550 anticipated personnel had moved by May 2015, with the
remainder to come later in 2015. After those personnel arrive, the population at Air Station New
River is expected to remain stable, at approximately 6,000 personnel.
Marine base interviewees suspect that if the U.S. re-engages in conflict in the Middle East, the
Marine population in Onslow County will grow accordingly.
Marine Corps Housing
Construction of additional housing units at Camp Lejeune started in 2007 with the growth in
personnel at the base. Construction of base housing was capped two years ago; no more housing
units are planned for construction. When the Middle East conflict wound down, the number of
Marines decreased, resulting in an excess inventory of base housing. There are approximately
250 excess housing units, and Air Station New River has gone into “waterfall,” which opens
excess housing to non-active troops. Priorities for those to be allowed to live in excess housing
include:
Retirees first, and then
Reservists, followed by
Federal civil servants, and then by
Contractors.
At the time of the interview, the “waterfall” program had opened some housing at Air Station
New River to Marine Corps retirees. In the future, new base personnel may be required to live in
on-base housing instead of having the option to live off-base. Camp Lejeune was not in
“waterfall” at the time of the interview, but was close to it.
9
While single troops have not been recalled to live on-base, personnel at grade E5 and below no
longer receive a housing allowance if they choose to live off-base; they must pay all their
housing costs. Marines with families are not yet required to use base housing, and there are no
plans to require them to do so. It is difficult for those without a military ID card to get on base,
and once on base they cannot access facilities, and children cannot attend base schools. There is
no transportation on the base to pick up/drop off children attending Onslow County schools.
Base Schools
One school was under construction at Air Station New River to replace Delalio Elementary
School. The school held 160 pupils; the replacement school will hold 300 students. Base school
enrollment decreased by approximately 400 students since the 2013-2014 school year, and a
Marine Corps spokesperson did not anticipate growth in the base school population.
Off-Base Residential Preferences
Marines can choose to live on- or off-base; they no longer need to receive permission to live off-
base. On-base quarters are generally smaller than off-base housing, which may create an
incentive to live off-base. In addition, more senior military personnel, particularly those with
working spouses, prefer to live off-base, as that is more convenient for family members.
Carolina Forest was said to be a major residential location that has attracted many troops at
Camp Lejeune and Air Station New River. Magnet schools in the Onslow County Schools
system are also a draw for military families with children. Other Onslow County elementary
schools said to draw military families include Swansboro, Dixon, and Richlands.
The new entrance to Camp Lejeune off Bell Fork Road will improve access from the
southwestern part of Onslow County and the Richlands area, as residents of those areas will no
longer need to drive through Jacksonville. Realtors were said to have noticed a shift in
residential preference to the southwest area, and the new entrance may be a factor influencing
that shift.
Water/Sewer
The Onslow Water and Sewer Authority (ONWASA) provides water and sewer services to the
unincorporated areas of Onslow County, as well as the Towns of Holly Ridge, Richlands,
Swansboro, and North Topsail Island. Pluris serves North Topsail Beach, Surf City, and part of
Sneads Ferry.
ONWASA
ONWAWA has experienced significant capital expenditures including:
Construction of the Northwest Wastewater Treatment Plant
Construction of the WATS trunk line
Purchase of the Summerhouse Wastewater Treatment Plant
Construction of the Piney Green trunk line
Construction of the Dixon reverse osmosis water treatment system
Arranging for future use of a quarry for water storage
10
Water
The Hubert Water Treatment Plant has a treatment capacity of 6 million gallons per day (MGD)
with average demand of 2.5-3 MGD. The Dixon Water Treatment Plant has a treatment capacity
of 4 MGD. ONWASA has agreements in place to allow purchases of water from Camp Lejeune
and Jacksonville.
ONWASA plans to sink a new test well for the Dixon Water Treatment Plant. If the test well is
successful, a permanent well will be sunk and the water pumped to the Dixon well field. The
Dixon plant is being upgraded with a reverse osmosis treatment system, and more wells are
being drilled to increase available capacity, as the plant will lose some treatment capacity with
the installation of the reverse osmosis system, so the utility is seeking additional water supply to
make up for that loss.
ONWASA is switching its water source from the Black Creek Aquifer to the Castle Hayne
Aquifer to avoid withdrawing too much water from the Black Creek Aquifer, which could result
in an increased risk of salt water intrusion into the aquifer. The utility is in its second reduction
in withdrawal from the Black Creek Aquifer, with a 50% reduction from previous withdrawals
now in effect. That level of reduction went into effect in December 2014. A 75% reduction will
take effect in 4 ½ years.
The Dixon and Hubert water treatment plants draw only from the Castle Hayne Aquifer. Water
for the northern part of Onslow County (generally north of US 17) is drawn from the Black
Creek Aquifer.
Sewer
ONWASA operates six wastewater treatment facilities. Major treatment facilities, as well as
using some capacity available from the Marine Corps, are described in Table 4.
Table 4: ONWASA Wastewater Treatment Plants
Location
Treatment Capacity
Comments
Summerhouse
0.4 MGD
Holly Ridge
0.25 MGD
Swansboro
0.6 MGD
Northwest (Richlands)
1 MGD
Expandable to 2 MGD
Kenwood
0.05 MGD
Will be switched to Richlands 12-18
months in the future (from May 2015).
Marine Corps (French Creek
Wastewater Treatment Facility
at Camp Lejeune)
3.5 MGD (by agreement)
Expandable to 5 MGD
The Northwest Wastewater Treatment Plant started operation May 4, 2015. The plant has a
treatment capacity of 1 million gallons per day (MGD) and can be expanded to treat 2 MGD.
The wastewater trunk line from Burton Industrial Park to Richlands will be opened in late June
2015. There is interest in rezoning some properties in that corridor to take advantage of the
sewer line.
11
The Summerhouse area in Holly Ridge has been the area served by ONWASA having the second
greatest level of growth. Current use of the Summerhouse and Holly Ridge treatment plants
utilizes less than one-half of the combined treatment capacity of those plants.
ONWASA’s treatment capacity has effectively increased as a result of a shift from allocating
treatment capacity to developers on a long-term to a shorter-term basis, as there is a time limit on
the duration of treatment allocation to new developments.
Jacksonville
A mandated reduction of water withdrawal from the Black Creek Aquifer is in progress.
However, if a water utility can show that its withdrawal rate has no negative impact on actual
aquifer levels, the utility may not need to further reduce the rate of its withdrawal. The reduction
is now 50% less than the previous rate of withdrawal, and Jacksonville would need to adopt a
75% reduction in about five years unless the city can show the current reduction has lessened the
impact to the aquifer. Jacksonville is working with Camp Lejeune to coordinate locations at
which both parties tap aquifers, as now both utilities’ taps are in close proximity. The well
locations need to be dispersed to avoid tapping too much at any single location.
Jacksonville’s wastewater treatment facility has a capacity of 9 MGD, with average demand of
approximately 5 MGD. The wastewater spray fields can treat up to 9 MGD; however, treatment
capacity is less on rainy days and during the winter. Camp Lejeune has excess treatment
capacity in addition to their commitments to ONWASA, resulting in additional treatment
capacity on the east side of the city. The Department of Defense is allowed to sell excess utility
capacity to outside users. Jacksonville could easily divert some wastewater to the Camp Lejeune
treatment facility, which could reduce the city’s treatment volume by up to 1 MGD.
A sewer moratorium was in effect at the time the developer sought approval for the Carolina
Forest development, and as a result, Jacksonville refused to annex that development, which
constructed a package sewer plant. The city is considering construction of a future sewer
connection to that development.
Jacksonville is extending a sewer interceptor along Western Boulevard to accommodate future
development. The city anticipates additional development further north in the US 17 corridor,
particularly in part of Hoffman Forest, and is looking to at ways to provide sewer service to
accommodate that anticipated development.
Richlands
The Northwest Wastewater Treatment Plant has a capacity of 1 MGD, of which 0.25 MGD is
reserved for Richlands. The ONWASA extension of sewer in the US 258 corridor to Richlands
effectively prevented Jacksonville from extending sewer in that corridor.
Swansboro
No new water or sewer improvements were in progress in Swansboro at the time of the
interviews.
12
Camp Lejeune
Camp Lejeune supplies wastewater treatment capacity to ONWASA. No negotiations were in
progress for any increase in treatment capacity; however, the base and the utility are discussing
access to water (as discussed in the ONWASA section above).
Transportation
Major transportation improvements planned for Onslow County, as listed in the North Carolina
Department of Transportation (NCDOT) Draft MTIP, FY 2016-2025, prepared in December
2014 include:
NC 53—widen to three lanes between Morningside Road to west of Holly Shelter Road,
4.2 miles. Planning/design was in progress.
US 17 Business—additional lanes with some construction on a new location between the
Jacksonville Bypass and Drummer Kellum Road, 1.4 miles. Construction is planned for
FY 2019.
US 17 Business—improve intersection with Bell Fork Road. Construction planned for
FY 2020.
US 258—realign intersections with Blue Creek Road and Ridge Road to form one
intersection. Construction planned in FY 2021.
US 258—construct SuperStreet between Pony Farm Road and NC 53, 2.2 miles.
Construction planned for FY 2023.
NC 24convert at-grade intersection with US 258 to an interchange. Construction
planned for FYs 2013-2024.
Piney Green Roadwiden to multi-lanes, part on new location between US 17 and NC
24, 2.6 miles. Construction was in progress, and NCDOT staff indicated construction
should be completed in the summer of 2016.
Jacksonville Parkway Extension—widen to multi-lanes, part on new location between
NC 53 and US 17. Construction planned FYs 2024-2025 and beyond.
Trade Street—construct roadway on new location between Western Boulevard and
McDaniel Drive. Construction planned for FY 2019.
NC 111—construction of an extension on new location between US 258 and Gum
Branch Road. Construction planned for FY 2023. This connection will serve as a
connector between the two north-south highway corridors instead of a previously
proposed Western Boulevard Extension, which involved environmental problems
associated with a crossing of the New River.
The Western Boulevard Extension proposed to connect between Gum Branch Road and
US 258/NC 24 is not likely to be constructed due to environmental problems involving
crossing the New River. A proposed connection between NC 111 and Gum Branch Road
will provide that link instead. (Jacksonville)
Gum Branch Road—widen existing roadway between Jacksonville urban area boundary
and Summersill School Road, 6.2 miles. Construction planned for FY 2025 and beyond.
NCDOT staff noted that the Gum Branch Road widening has been delayed and will likely
be reduced to three lanes at intersections and wide paved shoulders. Those improvements
are likely to be done in the next year or two, and the road may be widened in the second
part of the Strategic Transportation Initiative (STI).
13
Gum Branch Roadwiden to three lanes between east city limits of Richlands and
Summersill School Road, 7.5 miles. Construction not yet funded.
US 17construct interchange with Old Maplehurst Road and MCAS New River Main
Gate. Construction planned FY 2020.
NC 172—conversion of two-lane roadway to three-lane roadway with a two-way left turn
lane between the Camp Lejeune gate to NC 210. Construction planned FY 2017.
Other highway improvements in progress or planned in Onslow County that were mentioned by
NCDOT staff included:
1. US 17 improvements have been completed to Spring Hill Road in Onslow County. Bids
will be opened in June 2015 for construction of the final segment, which should take
approximately three years.
2. Construction of an interchange to the Wilson Gate of Camp Lejeune is complete;
however, the connecting highway on the base has not yet been completed. As a result,
the gate is open for inbound traffic only between 5:30-8:00 am, while it is open for
outbound traffic at all times.
3. Sandridge Road improvements are in the design phase, and construction is uncertain at
this time.
4. NC 111 will have paved shoulders added from the airport to the Duplin County line.
5. Dual left turn lanes from Gum Branch Road south to Western Boulevard are in the design
stage.
The Strategic Transportation Initiative (STI) had not yet been approved, but approval by the NC
DOT Board of Transportation was likely in June. Projects listed for action during the first five
years of the plan are likely to occur, but projects targeted for the second five years may need to
be reprioritized. The US 17 Bypass may be in the 10-year STI, but it is not in the five-year STI.
Non-Residential Development
Commercial Development
Onslow County is becoming a regional shopping center, as Jones and Duplin Counties do not
have major retail centers. Commercial development on Western Boulevard has been active
during the past few years, and is seen as resulting from the demand generated by recent Onslow
County residential development. Commercial development in the Western Boulevard Extension
corridor is anticipated to continue, as residential development has been strong in that area.
Commercial development remained strong during the recent economic recession. Four new
hotels will open soon in Jacksonville. Freedom Village (the commercial center at the
intersection of US 17 and US 258 with a Wal-Mart) has some available space, and there is
property in the area that may be redeveloped for commercial uses in the future.
Property across from Jacksonville Landing, by the Buddy Phillips Bridge, may be renovated.
Richlands Commercial Development
The recently constructed Wal-Mart is located in Onslow County; however, Richlands could
annex that parcel. The store is said to draw customers from a wide region, due to the lack of
14
such commercial centers in surrounding communities in several adjacent counties. Other
commercial development, such as fast-food restaurants and a home improvement store may
occur near the Wal-Mart in the future.
Swansboro Commercial Development
On May 19, 2015, Swansboro approved construction of a 160,000 square-foot Wal-Mart on NC
24 near Norris Road While having that store is not anticipated to draw many new residents to
the town, two outparcels will be subdivided for development, and there are several parcels
available for commercial development nearby on Hammocks Beach Road.
Industrial Development
Onslow County was said to be better positioned to accommodate industrial growth than it had
been in the past. Industrial development in Onslow County is focused on two major areas:
1. Burton Industrial Business Park—owned by Onslow County and located on US 258/NC
24. One business was expanding. The park is likely to see more mixed use, perhaps
involving industries needing office space and flex-space. The back end of the park is
getting ready for development, perhaps with small service-oriented industries. The park
is expected to see increased demand for space as it is served by the new sewer line to the
Northwest Wastewater Treatment Plant.
2. Davis Industrial Park in Holly Ridge—135 privately-owned acres that will be developed
as an industrial park targeted to service and light manufacturing industries. Duke Energy
is conducting a site feasibility study.
There are plans to bring aggregate in from the Morehead City port and distribute it at a facility to
be built on the railroad near Towne Pointe.
Several parcels zoned for light industrial use are available in western Swansboro, in the Seth
Thomas Lane area. A boat-building facility will be located near Hammocks Beach State Park.
Redevelopment
The Albert Ellis Airport is being redeveloped with a new airport terminal building, as well as
additional parking and a general aviation facility. The new passenger terminal, scheduled to
open later in 2015, will be capable of accommodating more and larger aircraft, as well as an
additional commercial carrier (in addition to Delta and American Airlines current serving the
airport). Local stakeholders mentioned a need to improve the highway connecting the airport to
US 258/NC 24.
Jacksonville would like to see some parcels on Lejeune Boulevard (NC 24) redeveloped before
seeing construction take place on undeveloped sites. This would help to keep development more
compact as well as enhance the area. The existing duplex and apartment units in the New River
area in Jacksonville may be redeveloped.
The Millis Fish House in Sneads Ferry has closed, and the site may be redeveloped as waterfront
housing. No large-scale commercial development is likely in the Holly Ridge/Sneads Ferry area.
15
Largest Employers
Table 5 lists the largest employers in Onslow County.
Table 5: Largest Employers
Employer Rank Employment Range
Department of Defense
1
1,000+
Onslow County Board of Education
2
1,000+
Camp Lejeune MCCS
3
1,000+
County of Onslow
4
1,000+
Wal-Mart Associates, Inc.
5
1,000+
Onslow Memorial Hospital
6
1,000+
Food Lion
7
500-999
Coastal Carolina Community College
8
500-999
Convergys Customer Management Group
9
500-999
City of Jacksonville
10
500-999
Coastal Enterprises of Jacksonville
11
500-999
McDonald’s Restaurants of NC, Inc.
12
250-499
Sag Payroll LLC
13
250-499
Stanadyne Corporation
14
250-499
Marine Federal Credit Union, Inc.
15
250-499
Source: NC Employment Security Commission: http://accessnc.commerce.state.nc.us Updated quarterly, April 13,
2015.
Future Non-Residential Development
Jacksonville is conducting a study to determine if the city should construct an indoor or an
outdoor sports facility. The city may construct a multi-use facility. A convention center facility
would serve well as an economic development tool, as it could host events such as military balls
that are now held elsewhere due to the lack of a suitable facility in Onslow County.
Hoffman Forest Tract 10 is likely to be sold for development if NCSU decides to sell part of
Hoffman Forest.
Residential Development
Onslow County has experienced a slight decline in residential development over the past four
years. National home builders entered the Jacksonville market during the recession, as they
could construct housing at a lower cost than local builders, but most national builders have since
left the Jacksonville market, and local developers were becoming active again. A substantial
amount of unsold housing inventory (approximately 10,000 properties for rent or for sale) was
said to make it challenging to sell a property in older neighborhoods. Also, a scenario was
described in which some Marines buy a townhouse, are subsequently moved to another post, and
then renting that unit but do not apply the rental payment to the mortgage, resulting in bank
foreclosure.
A new wave of housing construction has started and was in progress at the time of the
interviews. For example, approximately 800 houses were sold in Carolina Plantation during a
16
recent two-year period. Also, a developer reported having sold 75 units in the first five months
of 2015 versus a total of 80 units in all of 2014.
There has been a transition from smaller to larger subdivisions in Onslow County resulting from:
The availability of large tracts of land; and
The inability of small landowners to procure financing to develop their land, resulting in
larger developments such as Towne Pointe, Carolina Plantation, and Stateside by large
development companies or those who are able to self-finance.
Pender County, and particularly Hampstead, was said to be the current hot residential housing
market in the area.
Jacksonville Residential Development
Planners believe that relatively few new subdivisions are likely to be approved during the next
five years in Jacksonville, and most new housing is anticipated to be primarily infill in approved
subdivisions.
The developer of the New River complex, which was planned to include multi-family as well as
single family housing, is in bankruptcy. Jacksonville supports redevelopment in that area, as it
will support downtown redevelopment.
Jacksonville would like to see additional affordable housing, particularly if some apartments
were to be rehabilitated and converted to be affordable. However, a city spokesperson noted that
tax credits for affordable housing are better from new construction than from rehabilitating
existing housing. Also, Jacksonville would like to see better quality housing become more
available, as the military looks at the quality of local housing when making decisions on
constructing additional housing on base.
Residential developments in progress in Jacksonville include those listed below. Refer to the list
of subdivisions grouped by elementary school attendance area for additional information.
Williamsburg Plantation—nearly built out; new housing is infill on undeveloped lots.
Carolina Forest—nearly built out, with infill of undeveloped lots. Single family housing
construction is completed at Carolina Forest, with construction on apartments nearing
completion. Few school children were said to live in the apartments.
Cypress Creek / Vineyard—development of single and multi-family housing is likely to
occur over a longer term, perhaps 5-10 years in the future.
McRae Tracta mixed-use development with commercial uses fronting the highway and
residential development on the remainder of the tract.
North Marine Town Center—located at Piney Green Road and US 17 is planned for
approximately 200 townhouse and apartment units. Occupancy is likely 5-10 years in the
future.
Patriot Park—dormant but could see development after completion of the Piney Green
Road widening is completed in 2016. Development could include some small
commercial uses on Piney Green Road.
17
Richlands Residential Development
The numbers of permits issued for new construction in Richlands have been as follows:
2012 24 permits
2013 14 permits
2014 3 permits
2015 1 permit (through April)
Active residential subdivisions in Richlands include:
1. Tri-Field Estates—nearly built out, but may see construction of an additional phase of
development.
2. Maidstone Park—approximately 45-60 undeveloped lots available.
3. Winstead Townhouses—four buildings with 16 units have been constructed of a total of
85-100 units.
Stateside was to have been annexed by Richlands. State law requires a parcel to be annexed to
be located within three miles from the annexing municipality. The northernmost part of
Stateside met that criterion; however, that parcel has been sold so annexation of the remaining
portion of Stateside may be done only on a voluntary basis.
Potential residential development in Richlands includes:
1. Squires Run Village—200 houses possible, located north of Tri-Field Estates.
2. Unnamedpotential mixed-use development on a 400-500 acre parcel on the west side
of US 258. A significant portion of the parcel has wetlands, so only approximately 150-
200 acres are suitable for development.
Parcels in the vicinity of the Richlands High School have been logged recently, but interviewees
did not know if that was in preparation for development.
Swansboro Residential Development
The status of residential developments that were under construction in Swansboro at the time of
the previous land use study was:
Hall’s Creekconstruction still in progress.
Charleston Parkmay or may not still have construction.
Swansboro Acres—built out.
An unnamed new subdivision with 50 lots located in the Hammocks Beach area will be
submitted for approval and satellite annexation.
At the time of the interviews, no new multi-family residential developments were under
construction or approved for construction in Swansboro.
Residential Subdivisions
The three largest master planned residential communities under development in Onslow County
are Towne Pointe¸ Onslow Bay, and Stateside. Subdivisions under development or planned
include the following, grouped by elementary school attendance area:
18
Richlands Elementary:
Ashbury Park—located off Luther Banks Road. The windshield survey found one house
under construction and one completed and ready for occupancy.
Bradford Estates—approximately 180 lots with approximately 60 undeveloped lots,
located in the Catherine Lake area off Bannermans Mill Road, with houses priced from
$140,000s. The windshield survey revealed nine houses completed and ready for
occupancy in the existing part of this subdivision, which was nearly built out. A new
section is ready for the start of construction.
Buck Haven—Phase I nearly built out, and 50 additional single family houses to be built
on a parcel to the west of the current development located on NC 24 west of Richlands.
The windshield survey found five houses under construction and one house completed
and ready for occupancy.
Canon’s Edge—located off Cow Horn Road, with houses priced from the $160,000s.
The windshield survey found eight houses under construction and 14 completed and
ready for occupancy.
Cattle Branch—located off Coston Road, with houses priced from the $170,000s. The
windshield survey revealed 18 houses occupied, and no construction activity in progress.
Indigo Ridge—50 lots located near Richlands, with houses priced from the $130,000s.
Construction of houses was starting at the time of the interview, and the subdivision is
likely to be built out in 2-3 years. The windshield survey found six houses completed
and ready for occupancy.
Jessie’s Crossing—located on Jesse Williams Road, with houses priced from $139,900.
The windshield survey found 15 houses occupied and no construction activity in
progress.
Killis Hills—located off Cavanaughtown Road. The windshield survey found one house
under construction.
Maidstone—located off Comfort Road. The windshield survey found one house on
which construction had started some time ago but with no recent activity and one house
completed and ready for occupancy.
Turkey Ridge—located on Union Chapel Road. The windshield survey found one house
under construction and one house completed and ready for occupancy.
Verona—has lots available.
Winstead Place Townhouseslocated off Francktown Road. The windshield survey
found 13 units occupied, sitework in place for additional units, but no construction
activity in progress.
Unnamed—44 lots of which six were developed; located on Petersburg Road north of
Richlands.
Unnamed—30-acre parcel behind the Richlands Wal-Mart that is likely to be developed
with approximately 60 houses in the next couple of years.
Unnamed—a parcel located in the vicinity of US 258 and Gregory Fork Road that has
been subdivided into 11 lots.
Unnamed—a parcel located on Gregory Fork Road with 15 duplex units.
Unnamed—approximately 40 lots on Bannermans Mill Road on which construction may
start after Bradford Estates has been completed in the next few years.
19
Unnamed—parcel likely to be subdivided into approximately 25 lots, located off Five
Mile Road. That parcel has been held for 2-3 years, so development is not likely to occur
soon.
Unnamed—located on Hidden Hollow Road. The windshield survey found 34 houses
built and occupied, with no construction activity in progress.
Unnamed—located on Comfort Road across from Petersburg Road. The windshield
survey found this subdivision was built out.
Stateside Elementary:
Bluffs on the New River—located off Gum Branch Road. This subdivision was said to be
built out. No construction activity was observed during the windshield survey.
Holly Grove of Rock Creek—located off Rhodestown Road, with houses priced from
$170,000s. The windshield survey found 23 houses occupied in the western section.
Roads had been constructed in the eastern section, but no housing construction was in
progress.
River Bluff—located off Northwest Bridge Road. The windshield survey found no
construction activity in this built out subdivision.
Stateside—1,000 houses on 500 acres, with the first 200 lots having been planned at the
end of Stateside Drive, and 100 houses likely to be developed soon. Due to uncertainty
as to when ONWASA would complete the Northwest Wastewater Treatment Plant, the
developer will construct a package wastewater treatment plant on site with sufficient
capacity for 2,000 housing units. The developer has first right of refusal on an adjoining
1,000 acres. The Stateside development is not likely to start on the Weyerhaeuser portion
of the site.
Unnamed (40 acre tract)—approximately 60 lots that may developed in the next year or
two, located between Mendover Drive and Brothers Lane.
Meadowview Elementary:
Blue Creek Farm—located on Navy Blue Road, off Pollard Road. The windshield
survey found all houses occupied and no construction activity in progress.
Live Oak Estates—located off NC 111. The windshield survey found three houses
completed and ready for occupancy in this built-out subdivision.
Meadow Wood—25 lots with two houses built, located in the Catherine Lake area off
Fire Tower Road.
Moss Creek—located off Blue Creek Road. The windshield survey found all houses
occupied and no construction activity in progress.
Northridge—36 lots of which 14 have been built on, located on Pet Lane off US 258/NC
24, with houses priced from the $190,000s. The windshield survey found 12 houses
occupied and no construction activity in progress.
Woodbury—located off Meadowview Road. The windshield survey found all houses
occupied and no construction activity in progress.
Unnamed Townhouses—approximately 200 units on a parcel located off US 258/NC 24
near Wells and McAllister Roads.
Blue Creek Elementary:
20
Maggie’s Corner—approximately 40 lots, on which five houses have been built; located
on Gould Road and Pony Farm Road. The windshield survey found two houses under
construction and five occupied.
Sparrows Point—28 lots, with three houses started; located on Onslow Pines Road. The
windshield survey found two houses under construction and 29 occupied.
Tall Pines—23 lots located off Murrill Hill Road, with houses priced from $199,900.
Housing construction is planned to start soon and buildout is likely in two years. The
windshield survey found no construction in progress, and 25 houses occupied. Land had
been cleared in preparation for construction of a new section.
Unnamed—10 frontage lots on Murrill Hill Road.
Southwest Elementary:
Cobblestone—180 lots approved, but housing construction has not yet started; located off
Ernest King Road. No development activity was visible from the windshield survey.
Rockford Forest—110 lots, with 40 built and four with houses under construction;
located off Dawson Cabin Road, with houses priced from $150,000s. The windshield
survey found no houses under construction, three completed and ready for occupancy,
and 54 occupied.
Southwest Plantation—located off Harris Creek Road, with houses priced from the low
$200,000s. An interviewee said there is a possibility of additional development; but
nothing was definite at the time of the interview. The windshield survey revealed five
houses under construction and two completed and ready for occupancy in this golf course
subdivision.
Stoney Creek II (formerly Fieldstone)—150 lots planned on a parcel located off Dawson
Cabin Road.
Thompson Farms—located on Louie Road. The windshield survey found this
subdivision built out.
Zack’s Ridge—12 lots, with 3 built; located on Dawson Cabin Road. Buildout was said
to be likely within two years. The windshield survey found three houses completed.
Unnamed—5 lots on Wilmington Road off Dawson Cabin Road.
Dixon Elementary:
Bridgeport—178 single family lots plus 80 patio homes; 12 houses started; located on
Old Folkstone Road, with houses priced from $140,000s. The windshield survey found
eight houses under construction, one completed and ready for occupancy, and no houses
yet occupied in this new but very active subdivision.
Folkstone Landing—located on Folkstone Road, will contain a total of 375-400 housing
units comprised of 200 single family houses and 175 multi-family units priced from
$140,000s. The townhouse and apartment units were approximately 40% built out.
Pluris provides utilities. The windshield survey found one single family house completed
and ready for occupancy.
Grantwood—located on Jim Grant Road. The windshield survey found two houses under
construction, five completed and ready for occupancy, and five occupied.
Mimosa Bay—located off Old Folkstone Road, with houses priced from $200,000s. No
information was available from the windshield survey as a result of this being a gated
subdivision. Tax parcel data shows 40-50 lots available with lots moving rather quickly.
21
The Preserve at Morris Landing—Construction has begun on two phases. About 100 lots
are in parcel data with about 60 developed.
Nautical Reach—150 units with 55 lots in parcel data along Regatta Way; with houses
priced from the $170,000s. The windshield survey found 14 houses under construction,
13 completed and ready for occupancy, and 15 occupied.
Neighborhoods of Holly Ridge: The Hamptons—located off Ocean Road (NC 50), with
houses priced from $190,000s. The windshield survey found seven houses under
construction, six completed and ready for occupancy, and 12 occupied in the section
under development.
Oyster Landing—Single family and townhouse residences located on Sneads Ferry Road
(NC 172), with houses priced $139,000-$225,000. The final townhouses were under
construction; however, an undeveloped 150-acre tract behind the townhouses may be
developed in the future. Parcel data includes 66 lots of which most have been developed
(moving fast). Information on future phases is not available.
Redd’s Cove—approximately 60 lots, with the first section about half built out, located
off Hardison Road. Houses were priced from the $200,000s, and the subdivision was
said to be selling well. The windshield survey found no houses under construction, three
completed and ready for occupancy, and 12 occupied.
Summerhouse—dormant after having had hundreds of lots approved; however, an
interviewee believed that development may pick up someday.
The Landing at Everett’s Creek—located on Everett Yopp Road, with houses priced from
$140,000s. The windshield survey revealed two houses under construction, and 43
occupied. Construction was ready to start in a new section.
The Reserve at Holly Ridge—located on Bungalow Road, off NC 50. The windshield
survey found no houses under construction, eight completed and ready for occupancy,
and seven occupied.
Village at Folkstone—located on Folkstone Road, with houses priced from $160,000s,
and a sales rate said to be approximately 15-20 houses per year. The windshield survey
found five houses under construction and one completed and ready for occupancy.
Unnamed—68 townhouses planned on a 25-acre parcel in Sneads Ferry, located near the
intersection of Peru Road and Lawndale Lane. This parcel could be developed instead as
34 single family houses.
Unnamed—50 townhouses located on Peru Road next to Justice Farm.
Carolina Forest Elementary:
Carolina Forest—located off Western Boulevard. The windshield survey found this
development built out.
Carolina Forest Town Houses—80 units located on a parcel off Carolina Forest
Boulevard.
Carolina Plantationlocated off Ramsey Road in unincorporated Onslow County, and
nearly built out, with only approximately 40 townhouses to be built. Housing was said to
be selling at a rate of 8 units per month, compared to a peak of 25 units per month. There
is undeveloped land available, but municipal sewer is not available to support future
development, as the development is served by a package wastewater treatment plant. An
interviewee doubted that further residential development in the area of this subdivision
22
was likely due to the high cost of installing sewer. The windshield survey revealed 31
houses under construction and 15 completed and ready for occupancy.
Summersill Elementary:
Cypress Grove—put up for sale by D.H. Horton (originally to be developed by St.
Lawrence Homes) due to a prohibitively high cost of development. An interviewee
believed that no development is likely on that site in the next five years.
Williamsburg Plantation—located off Gum Branch Road, with houses priced from
$175,000. The only residential construction occurring in Jacksonville, and the
development was said to be for sale. Development was proceeding at a slower pace than
in the past, with approximately one house sold per month. The windshield survey found
four houses under construction, five completed and ready for occupancy, and 24 occupied
in the St. James Park section.
Bell Fork Elementary:
New River—there had been plans to build 100 housing units, then demolish 100 old units
and replace them, resulting in a net increase of 100 units; however, that development had
not taken place.
Hunters Creek Elementary:
Hunters Creek—The Farm—located off Piney Green Road, with houses priced from the
150,000s. Construction was finishing up on 135 lots, with 220 additional lots planned.
Infrastructure was nearly complete in a section with 50 lots, with housing construction
likely to start in mid-August 2015. Approximately 20-25 undeveloped lots remaining in
a section with 130 lots across the street from the middle school. The subdivision is the
first sewer customer to use the new ONWASA line, and the developer expects that the
Piney Green Road corridor will see additional development. Hunters Creek is located in
Onslow County, not Jacksonville. The windshield survey revealed two houses under
construction, and nine completed and ready for occupancy in the section under
development.
Morton Elementary:
Brook Ridge—44 lots located off Old 30 Road, and said to be selling slowly.
Coles Farmlocated off Old 30 Road, with houses priced from the $190,000s. The
windshield survey found 11 houses under construction, and four completed and ready for
occupancy.
Grants Creek Farms—proposed subdivision master planned for approximately 600 units
to be submitted for approval by Weyerhaeuser Realty Development Company six months
to one year after the time of the interviews in May 2015. Construction drawings have
been prepared for the first 200 lots, and the developer plans to start by developing 100
lots. There has been some interest in developing other land in that area.
Patriot Park—listed for sale by Koenig, Jr (Sr. died), and characterized as having high
front end infrastructure cost.
Sterling Farms—located off Old 30 Road, with houses priced from $160,000s. Tony
Sydes bought a tract on which 200 additional housing units will be developed. 20 lots
have been put out for construction, and another 40 were nearly ready to be put out. It is
23
likely that 20-30 houses will be constructed per year. The windshield survey revealed
three houses completed and ready for occupancy.
Trinity Crossing22 lots plus 38 lots on a parcel to the west, located off Old 30 Road,
with construction to start later this year. The windshield survey found two houses under
construction, four completed and ready for occupancy, and 33 occupied.
Waters Farm—35 lots, has been submitted to Onslow County for approval; located off
Old 30 Road.
Swansboro Elementary:
Forestbrooklocated on Hammocks Beach Road. The windshield survey revealed three
houses under construction and 50 occupied.
Forest Ridge—located off Hammocks Beach Road. The pace of sales was said to be
picking up; with four houses having been sold during 2014, but five being sold through
mid-May of 2015.
Halls Creek Southlocated between Hammocks Beach Road and Old Hammock Road.
The windshield survey found this subdivision was built out.
The Hammocks of Swansboro—85 townhouses located off Hammocks Beach Road.
Park Place—approximately 40 undeveloped lots in a subdivision by D.R. Horton, located
on Hammocks Beach Road, with houses priced from the mid $200,000s. The windshield
survey found four houses under construction, six completed and ready for occupancy, and
five occupied.
Peyton’s Ridge—approximately 400 lots, located off Pittman Road with houses priced
from the low $200,000s. The windshield survey revealed four houses under construction,
and five completed and ready for occupancy.
Holly Grove at Rock Creek—38 lots; roads just constructed; buildout anticipated in three
years; located near the intersection of Rhodestown Road and Gum Branch Road.
Rogers Farmlocated at the end of Mandy Road off Lee Rogers Road. The windshield
survey found two houses under construction, two completed and ready for occupancy, in
this nearly built out subdivision.
Shipwright Point—60 lots located behind the Wal-Mart site and schools in Swansboro.
Houses will be similar to those in Halls Creek, and priced $300,000+. Construction is
not anticipated to proceed quickly.
Sudden Ridgelocated on Ridgepath Road, off Parkertown Road, with houses priced
from the $190,000s. The windshield survey showed four houses under construction,
seven completed, and 11 occupied.
Swansboro Acres—located off Norris Street, with houses priced from the $140,000s.
The windshield survey found one house completed and ready for occupancy in this
otherwise built out subdivision.
Unnamed—development next to Park Place.
Watercrest Landing—subdivision located behind the Swansboro Food Lion is selling and
will expand. 29 lots platted and 21 occupied in last two years.
Cotton Hill (350 acre parcel off Riggs Road)—approximately 400 lots; 28 built.
Queens Creek Elementary:
24
Camden Woods—300 total lots located off Riggs Road, with houses priced from the
$160,000s. The bulk of the development is located on the east side of a creek through the
property. The windshield survey revealed no houses under construction, two completed
and ready for occupancy, and 18 occupied.
Highlands at Queens Creek—located off Queens Haven Road, with houses priced from
the $160,000s. The windshield survey showed four houses under construction and one
completed and ready for occupancy. The subdivision is about built out.
Jacks Branch---located off the road to Highlands at Queens Creek. The windshield
survey revealed this subdivision was built out.
Kingsbridge and Highlands—approximately 140 total lots in expansions to those
subdivisions in Swansboro. Houses are deemed likely to sell quickly, similar to
Sagewood, which sold out in two years.
Raymond’s Landing Townhouses—24 townhouses located off Bear Creek Road near the
base gate. No construction was visible from the windshield survey.
Sagewood—160 lots, located off Sand Ridge Road. The windshield survey found this
subdivision nearly built out, with seven houses under construction, and eight completed
and ready for occupancy.
The Bluffs at Starling Point—located off Great Neck Landing, with lots from $65,000-
$250,000. The windshield survey found no construction in progress, and 18 lots
available.
Vista Cay Villagelocated on both sides of Vista Cay, with houses priced from
$150,000s, had 14 houses occupied and no construction activity.
Unnamed—23 lots and 26 lots to be developed in subdivisions at the southern end of
Riggs Road.
Silverdale Elementary:
Azalea Acres—30 large lots to be developed next year, located on Azalea Plantation
Blvd. off Riggs Road.
Towne Pointe—approximately 5,000 total housing units, including single- and multi-
family units, and located off Rocky Run Road. Originally consisting of 1,800 acres, a
600-acre parcel was sold to another developer who plans to develop 900-1,000 lots, to be
called Onslow Bay. Approximately 250 units had been constructed, and 100 lots had
been sold to builders at the time of the interview. The developer plans to construct
approximately 200 houses per year. Housing units are currently selling for $180-$275
per square foot. Onslow County Schools has been given options on two potential school
sites in the development. Construction on the Colony at Towne Point, with
approximately 100 duplex housing units is planned to start in October 2015, with
occupancy of the first units in May 2016. Towne Pointe development will be served by
both Duke Energy (front 2/3) and Jones-Onslow Electric Cooperative (back 1/3). Duke
Energy may construct a new substation to better serve the Towne Pointe area, which is
served by a transmission line running between Jacksonville and Havelock. The
windshield survey found eight houses under construction and eight houses completed and
ready for occupancy, with many houses occupied.
Waterford Ridge—approximately 40 lots planned and permitted; located on Belgrade
Swansboro Road.
Unnamed—9 lots in a subdivision on Riggs Road north of Camden Woods.
25
Unknown E.S.:
The Landing at Mill Creek—proposed; construction is likely to be several years in the
future.
Permeter Branchapproximately 50 units, with site engineering in process.
Multi-Family Housing
A shift to construction of multi-family housing resulted from financing for construction of
single-family houses drying up during the recession. Apartments met the demand for housing
during that time, but recently the demand for new multi-family housing has decreased.
The multi-family housing market has slowed to a point where one interviewee didn’t expect to
see more multi-family development soon. One interviewee believed that only multi-family
housing complexes with 50-80 units and eligible for tax credits are likely to be built, primarily in
the Western Boulevard/Gum Branch Road area.
Mobile Homes
No new mobile home parks have been approved in Onslow County. Small duplex houses and
permanent campers have been more prevalent than mobile homes. Onslow County is
considering a change to its ordinance that would limit the length of time a camper can be located
on a site, in an effort to limit the numbers and locations of permanent campers.
Other Future Residential Development
Economic development officials were not aware of any development plans from Weyerhaeuser
to develop any of that company’s tracts.
Alligator Acres may be owned by an out-of-state owner and may or may not be developed.
One interviewee didn’t see any subdivisions likely north of Swansboro, in the Richlands area, in
the Catherine Lake area, in western Onslow County, or in Jacksonville.
26
List of Interviews and Data Sources
Interviews:
Personal interviews were conducted with the following:
Department of Defense: Joe Ramirez, Donna Grundy
NCDOT: Robert Vause, PE, District Engineer
Onslow County: Jeff Hudson, County Manager
City of Jacksonville: Ron Massey, Deputy City Manager;
Anthony Prinz, Transportation Services
Administrator
Town of Richlands: Gregg Whitehead, Town Administrator
Town of Swansboro: Scott Chase, Town Manager
ONWASA: Billy Farmer, Executive Director
Jones-Onslow Electric Cooperative: Paula Redick, Steve Goodson
Duke/Progress Energy: Bob Dupuis
Jacksonville-Onslow Chamber of Commerce: Laurette Leagon, President
Jacksonville-Onslow Economic Development: Sheila Pierce, CCIM, Executive Director
John L. Pierce & Associates: John Pierce, Owner
Hunter Development Corporation: Michael Tuton, Owner
Parker & Associates: John Parker, Owner
Pittman Soil Consulting: Haywood Pittman, Owner
Data Sources:
Data were compiled from the following sources, in addition to those cited above:
U.S. Census Bureau: www.census.gov
North Carolina Office of Budget and State Management:
http://www.osbm.state.nc.us/ncosbm/facts_and_figures/socioeconomic_data/population_
estimates.shtm
North Carolina Department of Commerce: http://www.nccommerce.com/
North Carolina Department of Transportation: www.dot.state.nc.us
Onslow County: http://www.onslowcountync.gov/default.aspx
Onslow County Planning Department: http://www.onslowcountync.gov/Planning/
Onslow Water and Sewer Authority: https://www.onwasa.com/
City of Jacksonville: https://www.jacksonvillenc.gov/
Town of Holly Ridge: http://townofhollyridge.net/
Town of Richlands: http://www.richlandsnc.gov/
Town of Swansboro: http://swansboro-nc.org/
Town of North Topsail Beach: http://www.ntbnc.org/Pages/default.aspx
Jacksonville-Onslow Chamber of Commerce: http://www.jacksonvilleonline.org/
Jacksonville-Onslow Economic Development: http://www.onslowedc.com/