Schedule A to - 2022 T3 Triannual Capital Status Memo
Status of Active Capital Projects as of December 31, 2022
Classifications/Capital Projects
Replace existing baseball field lighting on Field #1 at Palgrave Baseball Diamonds.
Project will include new light poles and light fixtures. Q3-2023 205,000 100% 71% 100% 205,000
22-085 Park Sustainable Neighbourhood Action Plan (SNAP) Improvements
Introduction of new park elements within the Sustainable Neighbourhood Action
Plan area of Bolton. The project will see the introduction of educational/promotional
signage across the three parks. Adam Wallace Memorial Park will receive a rain
garden, pollinator gardens, benches and picnic tables, and tree trunks lining the
existing trail through the woodlot. Foundry Park will receive bike racks and a bike
repair station, adult exercise equipment, benches and picnic tables, and native
plantings. Ted Houston Park will receive a natural play playground. Q2-2023 245,000 43% 27% 78% 190,379
22-087 Outdoor Active Recreation Infrastructure Caledon East
Project will begin with community consultation to determine the outdoor active
needs of the Caledon East catchment areas. An in depth review of the Town Hall
Campus Plan (2017) will determine prime location(s) for potential the outdoor
infrastructure such as skate park, pump track, BMX facilities, obstacle course, etc.
The design and construction of the proposed facility will be based on the input
received during the community consultation. Q4-2023 605,000 100% 0% 100% 605,000
22-088 Dennison Park Washroom Building
Dennison Park is the largest park in the Southfields development which includes
splash pad, playground, soccer fields, gazebo, hard court, pathways, and green
space. Final phase of park development requires a construction of washroom facility
to support the existing amenities. The washroom facility will be fully accessible and
provide service to all users. The washroom facility will have two bathrooms and a
possible small office space for parks operations. Q4-2023 268,500 100% 0% 98% 262,221
22-089 Johnston Sports Park - Phase 4 Washroom
Johnston Sports Park is a large soccer facility with 6 soccer fields and a large shade
structure. As part of phase 4, Johnston Sports Park is to receive the design and
construction of a new washroom/storage building. The washroom facility will be fully
accessible, contain storage area for user groups and a snack bar. Q4-2023 1,500,000 100% 0% 100% 1,497,884
22-091 Bolton Bandshell - RJA Potts Park
Rotary Club of Bolton in partnership with Town of Caledon to design and construct
bandshell within RJA Potts Park, Ward 5 Landsbridge St. and Dovaston Gate) to
celebrate Boltons bicentennial. There have been multiple resident requests for
formal outdoor performance space. Ideally the bandshell will be constructed by
Bolton's Bicentennial event (June 2022). The bandshell stage will be slightly elevated
for ease of site while still being fully accessible. Q4-2023 472,500 11% 1% 90% 423,846
22-093 Palgrave Baseball Diamonds - Washroom Upgrade
The washroom facility at the Palgrave Baseball Diamonds (15+ years old) does not
meet current Accessibility for Ontarians with Disabilities (AODA) standards. The goal
of this project is to bring the building up to building code. Q2-2023 100,000 100% 100% 100% 100,000
22-097 Town Hall Improvements
There is carpet tile throughout the Town Hall in all office areas and meeting rooms
(not hallways or atrium). The project will address tiles that are worn out, ripped or
soiled creating accessibility issues. Level 2 tile will be prioritized where the carpet is
up to 20 years old. Spot repairs will be included as required throughout the facility. Q3-2023 75,000 100% 100% 29% 65,003
22-104 Rotary Place Enhancements
This project is to improve, enhance and add to the Rotary Place building and the
areas that were not carpeted / refreshed in the Rotary Place Expansion project . The
project would touch on the following items, new shingle and roof repairs, new
HVAC units to service the facility better and new flooring in the community rooms
and common areas of the building. Q2-2023 350,000 100% 100% 100% 349,870
4 of 19